Our Platforms

Enterprise Platforms for
Construction Intelligence

AICA builds and owns proprietary software engineered specifically for the complexity, compliance, and scale demands of construction and project management organisations.

Flagship Product · Schedule Governance

SchedGate

AI-Powered Schedule Governance Platform for Primavera P6 Portfolios

SchedGate brings automated, systematic governance to construction schedule management. It ingests Primavera P6 XER files natively, runs the full DCMA 14-point health check battery, enforces stage-gate submission controls, and gives planning managers and portfolio directors a single source of truth across all projects.

Built for EPC contractors, Tier-1 construction firms, and large programme management offices operating multi-project P6 environments.

200+

Hours Saved / Month

<4

Months to Positive ROI

487

EPPM Governance Rules

Monte Carlo

Risk Simulation

Native XER Ingestion

Direct upload of Primavera P6 XER files — no middleware, no manual export. Parses TASK, TASKPRED, PROJWBS, and TASKRSRC tables with full fidelity.

  • 27 TASK field mappings
  • 7 TASKPRED relationship fields
  • Supports files up to 100MB
  • Version management & baseline locking

DCMA 14-Point Analysis

Automated computation and reporting of all 14 DCMA schedule health checks. Drill down to flagged activities with export to PDF.

  • Missing logic, high float, lags
  • Negative float, total float < 0
  • Invalid constraints & date overruns
  • Scorecard (0–100) per schedule version

5-Gate OOS Detection Engine

Proprietary 5-gate algorithm detects out-of-sequence progress at every submission — flagging logical violations before they compound.

  • Gate 1: Activity start before predecessor finish
  • Gate 2: Remaining duration anomalies
  • Gate 3: Float gain detection
  • Gate 4–5: Critical/near-critical OOS patterns

5-Gate OOS Engine — Severity Levels

Each gate flags activities with a severity rating, enabling planners to prioritise remediation by impact.

Gate 1 — Predecessor Logic Violation Critical

Activity started or progressed before mandatory predecessor is complete

Gate 2 — Remaining Duration Anomaly Major

Remaining duration inconsistent with reported actual progress percentage

Gate 3 — Float Gain Detection Major

Total float increased between submission cycles without logical justification

Gate 4 — Critical Path OOS Critical

Out-of-sequence progress on critical or near-critical path activities

Gate 5 — Submission Window Violation Advisory

Schedule submission outside the configured reporting window for the project

Parametric Check Library

32 configurable governance checks beyond DCMA — all threshold-adjustable per project type, phase, or client standard.

Schedule Quality

Missing resources, baseline deviation, logic density, relationship type ratios

Duration Controls

Maximum activity duration, zero-duration activities, calendar assignments

Constraint Checks

Hard constraints, SNET/SNLT flags, date overruns relative to data date

Progress Checks

Actuals in future, unstarted critical activities, float margin enforcement

Super Admin Dashboard

Platform-wide governance overview — configure check thresholds, manage submission windows, monitor all projects across portfolios, and run ad-hoc parametric audits.

Complete Platform Capabilities

Multi-Project Portfolio View

Portfolio-level dashboard aggregating health scores, OOS counts, and compliance status across all active projects simultaneously.

Cumulative Actuals Engine

Tracks and trends planned vs actual progress over time, building a historical record of schedule performance across submission cycles.

Power BI Integration

Native Power BI integration for executive-level portfolio reporting — custom dashboards with real-time schedule and compliance data.

Monte Carlo Risk Simulation

Probabilistic schedule risk analysis using Monte Carlo simulation — models uncertainty across activities to forecast schedule confidence levels and P80 completion dates.

Automated Email Notifications

10 trigger-based notifications for submission reminders, check failures, baseline changes, window openings, and governance violations.

Enterprise Cloud Deployment

Deployed on enterprise-grade cloud infrastructure with SSO, secrets management, and high-availability database services.

Early Adoption Partnership

SchedGate is available for enterprise deployment

Contact us to discuss requirements, scope, and commercial arrangements tailored to your portfolio.

Request a Proposal
Flagship Product · Construction PMIS

AICA Hub

AI-Native Construction Project Management Information System

AICA Hub is a fully integrated PMIS covering the complete construction project lifecycle — from portfolio initiation and project charter through planning, controls, delivery, and handoff. Powered by an embedded Generative AI reasoning and intelligence layer.

Built for construction firms, programme management offices, and infrastructure project teams that demand structured governance, RBAC, and multi-project visibility from a single platform.

Generative AI Layer

Embedded intelligence across the platform

WBS/OBS/CBS AI Generation

PMI PMBOK 7 + AACE compliant suggestions

RACI AI Matrix

Auto-generated from WBS + OBS + Charter

PIF Narrative Generation

7-page PDF project initiation form auto-compiled

OBS 6-Step AI Wizard

Organisation structure from roles, contractors, subs

25+

Modules

158

Features Built

Plug & Play

Out of the Box

Full Platform Module Map

AICA Hub covers every phase from project initiation to delivery handoff — a single system replacing multiple disconnected tools.

Platform Foundation

  • Auth & RBAC (4 platform roles)
  • Admin Panel & Org Management
  • Multi-Tenant Architecture
  • Module Enable/Disable per Org
  • Workflow Engine (8 DB tables)
  • Reference Data Management

Project Initiation

  • Portfolio Management
  • Project Creation Wizard (3-step)
  • Project Charter Form
  • Phase Gates (G0–G4, PMI)
  • Stakeholder Register
  • PIF (AI-generated 7-page PDF)

Planning & Controls

  • WBS (XER-driven or custom)
  • OBS — Organisation Breakdown
  • CBS — Cost Breakdown Structure
  • RACI Matrix (AI-generated)
  • Milestones (List + Timeline)
  • Initial Risk Assessment

Delivery Modules

  • Scheduling & XER Compliance
  • DCMA 14-Point (auto-run)
  • S-Curves (resource/cost)
  • Cost Control & Budget
  • Risk Management (RAID)
  • HSE & Quality Modules

Governance & Compliance Built In

PMI PMBOK 7 Aligned

WBS, CBS, and phase gate structures follow PMI PMBOK 7 and AACE guidelines. AI suggestions enforce 3-level limits and naming standards.

Role-Based Access Control

Multi-tier RBAC ensures users see only what they are authorised to access. Viewer role enforces absolute read-only — no override possible.

Workflow Engine

Structured workflow system drives submit/approve/lock flows for charter, PIF, scheduling, and document modules — full audit trail on every state change.

Multi-Tenant Isolation

Full data isolation between organisations. Users see only their own organisational data — enforced at the data access layer.

Enterprise SSO

Single sign-on integration supports enterprise identity providers for seamless and secure authentication across the platform.

Audit & Change History

Field-level change history and activity logs provide a complete audit trail for project governance and compliance reviews.

Platform Delivery & Licensing

AICA Hub is available for enterprise licensing

Contact us to discuss scope, modules, deployment, and commercial arrangements tailored to your organisation.

Request a Proposal

Interested in SchedGate or AICA Hub?

Both platforms are available for early adoption partnerships. Get in touch to discuss requirements, timelines, and commercial arrangements.

Start the Conversation